Showing posts with label Double 4 patch. Show all posts
Showing posts with label Double 4 patch. Show all posts

Friday, October 6, 2017

As I mend......

  The knee is better finally after 12 days.....I am walking rather than limping.  The swelling is less, pain is much better, I just am cautious when stepping out or turning/shifting direction.  Today I picked up the knee brace and wore it when we did two errands.  No photo....it is not elegant.  In fact it is ugly/awful  and stiff....but it does help keep the knee stable.

  But on to better things.  I have not done much in the sewing room....sorting and finding things I had set aside.  I was asked yesterday if I was still quilting.  I hated to answer with yes, and no.  But it is truthful.  I am a quilter, just not productive recently.  Pain is the biggest sap to my creativity.    That silent enemy I battle each day.  Like the little train that said, I think I can, I think I can.......I keep pushing and planning.

  I have pinned two tops for quilting....the floral rail fence and the floral scrappy mountains.  These are my main project for the month.....get them quilted.  I can only sit for short periods and have to move around to reduce the stiffness, so it might just take me all month.



   The shopping therapy.......I gave in to the need for more wonder clip things.   The dozen I had just were not  enough.  Instead of the expensive "name" set, I found 100 of them for  much less  on Amazon.  Mixed colors and 2 sizes satisfied that need.

Notice what they are resting on?



    I  found a set of six fast food trays to use for project trays.  Linda at Art In Search  commented that she was using cafeteria trays for her floral squares/strips.  I loved the idea and broke down and got a set.  I chose the smaller size of 10'' by 14'' fast food size.  If I am using them for floral squares, they stack and fabrics don't slide around.  They have the sides to contain pins, clips, small appliques, etc.



   I set this one up for my leader ender assortment.  This is a very scrappy Double 4 Patch in various stages.  I have about 10 blocks put together and the rest of these parts/piece units.    Instead of putting everything away, I plan on letting the tray next to the machine so I can make progress on this one.

    The guild's Quilt Show is this weekend.  I am slated to sit at the admissions table on Saturday morning.  So I need to bake up some goodies for the  "food room" as Sir Old Man calls it!  That should keep me out of trouble for today.
Thank you all for checking up on me during my knee rest.
Keep on stitching.
Related Posts Plugin for WordPress, Blogger...